JJE moving toward the greener future
- Categories:News
- Time of issue:2024-06-20
- Views:589
(Summary description)On May 28, 2024, the 5.9-MW photovoltaic power generation system at JJE Heze plant – JJE’s largest plant - is commissioned. The system can generate 7000 MWH of green power and reduce more than 6000 tons of carbon dioxide emission each year.
JJE moving toward the greener future
(Summary description)On May 28, 2024, the 5.9-MW photovoltaic power generation system at JJE Heze plant – JJE’s largest plant - is commissioned. The system can generate 7000 MWH of green power and reduce more than 6000 tons of carbon dioxide emission each year.
- Categories:News
- Author:
- Origin:
- Time of issue:2024-06-20
- Views:589
On May 28, 2024, the 5.9-MW photovoltaic power generation system at JJE Heze plant – JJE’s largest plant - is commissioned. The system can generate 7000 MWH of green power and reduce more than 6000 tons of carbon dioxide emission each year.
This is a significant step for JJE in moving toward sustainable operation.
Scan the QR code to read on your phone
北京网站建设有限公司 Copyright © All Rights Reserved 京ICP备13000456号- 1